Access Stairs

Client: Rio Tinto

We were engaged to design, fabricate & install access stairs along the RTIO rail network to allow Safe access for Signal techs between tracks. The installation involved strategic planning with Rail Operations & Train control with both Lifting plans over track & limited obstruction times.Project was completed ahead of time with no incidents.


Yurra Pty Ltd